top of page

KEPLEY_EXT_01_1.jpg

KEPLEY_01.jpg

pic 1.jpg

KEPLEY_EXT_01_1.jpg
1/3
Completed in March 2002, this 7,228 sq.ft. medical office building was designed and built for Dr. Keyley and Dr. Wemmer. It was designed in a neo-classical style with a concrete tile and metal roofing blend. A fieldstone perimeter wainscot establishes a strong foundation element. It includes two suites with a shared mechanical core and entry porte cochere. The building satisfies all wind codes, ADA accessibility requirements and is fire code compliant.
Kepley / Wemmer Medical Building
Vero Beach, FL
bottom of page